State Contract

Coyle Construction Inc

Awarded by George Mason University

Centreville, VA

Description (as filed)Proposal Date: 01/25/2024 GMU estimate to grind concrete and set a new threshold at Whitetop door C4 1. Background. The concrete sidewalk at door C4 is raised and is preventing the door from closing. The threshold has been removed to allow the door to close. The concrete needs to be shaved sufficiently enough to allow a low profile threshold to be installed. Shaving the concrete will allow the door to close properly and prevent water from coming into the building. We propose the following: a. Use 5” surface grinder to remove a sufficient quantity of concrete to allow for the installation of a threshold and allow the door to close. b. Purchase and install new low profile threshold. c. Clean up trash and dust.

Source import recorded Oct 21, 2026

Contract number: 2024_1051130

Open source dataset or portal

The source link opens the dataset or portal. Use the complete identifier and vendor below to locate this record; an exact source-row link is not verified.

Award amount

$1,600.00

as reported by the state

Start date

2024-01-26

period begins

Obligated to date
-- Not reported
money committed so far
End date
-- Not reported
period ends

RECIPIENT

Vendor

Vendor (as filed)Coyle Construction Inc
Matched employer recordCoyle Construction Inc

Matched by normalized vendor name; a shared name is not proof of identity.

THE AWARD

Award details

Awarding agencyGeorge Mason University
NIGP91052
Contract number2024_1051130
Description (as filed)Proposal Date: 01/25/2024 GMU estimate to grind concrete and set a new threshold at Whitetop door C4 1. Background. The concrete sidewalk at door C4 is raised and is preventing the door from closing. The threshold has been removed to allow the door to close. The concrete needs to be shaved sufficiently enough to allow a low profile threshold to be installed. Shaving the concrete will allow the door to close properly and prevent water from coming into the building. We propose the following: a. Use 5” surface grinder to remove a sufficient quantity of concrete to allow for the installation of a threshold and allow the door to close. b. Purchase and install new low profile threshold. c. Clean up trash and dust.

LOCATION

Place of performance

CityCentreville
StateVA

ORIGINAL RECORD

Source record

Procurement portalVA procurement portal
State contractsVA

The stored run f5a788cc-2d89-4a00-bad1-cdcc5cdf50e5 belongs to contracts_aus, not this jurisdiction. Source custody is unresolved.

Ingested2026-07-14

State-procurement record: state taxpayer money awarded to this vendor.

Vendor records

Other government financial records with this vendor

AgencyLedgerRecorded value
George Mason UniversityXH1B record ID: a0899e25-2829-43a2-b83b-940f72eadc8b2026-05-26State · VA$2,208.92Award amount
Northern Virginia Community CollegeXH1B record ID: 2380df8a-df0a-440f-9b33-cb5e964eaf912026-04-29State · VA$41,568.00Award amount
George Mason UniversityXH1B record ID: 4002f5d3-cc45-40be-99e6-17c89fc4885e2026-04-28State · VA$3,532.80Award amount
George Mason UniversityXH1B record ID: 1d552d6d-531e-4d05-8367-e03621bec1212026-04-14State · VA$11,481.00Award amount
George Mason UniversityXH1B record ID: f2f8d31a-bfcb-4b18-a5ad-71634c0bd3662026-04-14State · VA$8,410.00Award amount
Northern Virginia Community CollegeXH1B record ID: f7552ee5-0d70-42bc-a95b-82e513c75db52026-04-09State · VA$10,473.00Award amount
George Mason UniversityXH1B record ID: 81460063-4e24-4868-9648-49b6da8a56392026-04-08State · VA$5,097.00Award amount
George Mason UniversityXH1B record ID: a50d617a-d17a-46e2-a4c9-5d998bfa531b2026-04-08State · VA$7,792.00Award amount

State records show awards as filed, except CT, which shows vendor payments. Federal records show obligated totals. These measures must not be added.

Browse the VA contract ledger · vendor dossier

Questions about the data & methods

What is this state contract?

This is a procurement record for Coyle Construction Inc (Virginia), published by the state's purchasing system and loaded here as public spending data.

How much is the Coyle Construction Inc contract worth?

The record shows $1,600.00 in awarded value. State procurement systems report these figures; this page quotes them as recorded.

When does the Coyle Construction Inc contract run?

The recorded performance period starts Jan 26, 2024.

Which agency holds the Coyle Construction Inc contract?

George Mason University is the awarding agency on the record.

Where can I inspect the matched employer record?

This contract record is linked to the Coyle Construction Inc employer dossier. That link alone does not establish that the vendor and employer are the same entity or that this vendor has H-1B filings. Inspect the dossier for available filing, wage and layoff records.

Public source records and site analysis. We do not attest to accuracy. Read the full disclaimer.

Dataset guides and site methods

  1. [1] XH1B method or registry · XH1B. State contracts and Connecticut payments: source registry; Reading Public Records and Derived Indicators. Source registry entry: state_contracts; Reading records: units, source coverage, wage gaps, entity links, and inference limitsXH1B dataset description: State government award and vendor records. Connecticut Open Expenditures records payments, including grants. Payment totals stay separate from contract awards. Record identity fields vary by source; amounts and descriptions do not set identity.; These are the site's review methods, not validated predictions of wrongdoing. Inspect underlying records and alternative explanations.
  2. [2] Dataset documentation · USAspending / U.S. Treasury. Federal Spending Guide: contract transactions. Pages 3, 5, 9 and 17: transactions, amount fields and recipient identifiersContract downloads contain prime award transactions. XH1B’s use of recipient identifiers for employer links is its own processing step.Checked 2026-10-18.